THE REBUILD SEQUENCE

What rebuilding
actually looks like.

Five clear phases, one coordinated path. Each stage is presented with the same structure so the sequence is easy to understand at a glance.

01
HOMEOWNER / SITE

Debris Removal

Before rebuilding advances, the property must move through the required debris-removal and site-clearance process.

02
HOMEOWNER / SITE

Insurance & Records

Organize claim information, prior records, available plans, surveys, and site documentation so the rebuild starts from a reliable base.

03
SA DESIGNS LEADS

Design & Scope

We define the rebuild direction, establish scope, coordinate consultants, and develop the architectural package around the property and your goals.

04
SA DESIGNS LEADS

Permit Submittal

We prepare the permit-ready architectural documents, coordinate required disciplines, and guide the package through the applicable jurisdiction.

05
SA DESIGNS SUPPORT

Build

Once permits are issued, construction begins. We remain available for RFIs, revisions, clarifications, and coordination throughout the build.

WHAT WE PROVIDE

Architectural services for
fire-affected properties.

From documenting what existed to preparing the new permit package, the work is organized around one coordinated architectural process. Third-party consultants remain owner-retained; we coordinate the team and the sequence.

01

As-Built Documentation

Accurate existing-condition drawings created from available records, field information, and verified site conditions.

02

Like-for-Like Rebuild

Permit-ready architectural documentation for a replacement home that closely follows the previously approved structure and current rebuild rules.

03

Custom Redesign

A new architectural direction for the same property, coordinated around setbacks, site constraints, fire-resistive requirements, and the way you want to live now.

04

ADU & JADU Addition

Evaluate whether an ADU or JADU can be incorporated into the rebuild strategy and coordinate it alongside the primary residence.

05

Construction Documents

A coordinated permit set including plans, elevations, sections, details, and the architectural information required for review and construction.

06

Consultant Coordination

We identify and coordinate the structural, soils, survey, energy, and other specialists required so the project moves as one team.

WHAT TO KNOW NOW

Key requirements
before you build.

Start with the right information, the right sequence, and a realistic understanding of what your property requires. The details vary by site, but the process becomes much clearer when these items are addressed early.

01

Debris removal comes first. Confirm the property has completed the required cleanup and clearance steps before relying on a construction schedule.

02

Site and soil conditions can change the path. Post-fire conditions, slopes, geology, utilities, and existing site infrastructure can trigger additional coordination or specialist review.

03

Use the dedicated rebuild pathways. LA County provides One-Stop Permit Centers, rebuild applications, and expedited tools specifically for wildfire recovery projects.

04

Scope changes should be decided early. A larger home, altered footprint, added ADU, or meaningful layout change can affect the review path. Establish the direction before the permit set is developed.

WHY SA DESIGNS

A firm that moves
projects forward.

15+

Years in LA County

LA

City + County jurisdictions

SFR

Single-family rebuild focus

ADU

Rebuild + add a unit

01

Based in Los Angeles — we know LA County and city jurisdictions, plan check processes, and inspector expectations.

02

Experienced with SFR, ADU, and JADU permits across unincorporated LA County and incorporated cities including Glendale, Burbank, Pasadena, and Santa Monica.

03

Flat-fee proposals with defined scope — you know exactly what you’re paying for before work begins.

04

We coordinate all third-party consultants so you are not managing multiple vendors simultaneously.

05

Fire-resistive construction requirements for WUI zones and ignition-resistant assemblies are built into our documents.

06

We know the expedited permit pathways — and how to use them to your advantage.

07

We respond. We know your timeline is urgent and we treat it that way.

OFFICIAL LA COUNTY RESOURCES

City & County
rebuild resources.

Direct links to the current official LA County pages referenced by this rebuild guide.

01

LA County Wildfire Recovery

Official Los Angeles County recovery hub for wildfire rebuilding, permits, debris removal, updates, and support.

02

One-Stop Permit Centers

Official locations, hours, appointments, and rebuild consultation information for the County permit centers.

03

Rebuilding 101

LA County’s current rebuilding hub with planning resources, permit applications, expedited pathways, and related programs.

04

Debris Removal Program

Official debris-removal program information, final sign-off records, insurance guidance, and current County resources.

05

Permitting & Fee Waivers

Current County guidance on qualifying fire-rebuild permit fee deferrals and refunds, including eligibility and application details.

06

Licensed Contractor List

LA County’s current licensed contractors and industry professionals list, plus contractor-vetting guidance.